CLK Yapı Group

Loading page

Interior of a large hall with steel and glass arches

CLK Yapı Group

Steel construction speed for urban renewal

A lighter, faster and seismically more predictable structural frame: fabricated in the workshop, assembled on site in days rather than weeks.

Get a quote

01About us

Speed, lightness and reliability in steel construction

CLK Yapı Group builds steel structural frames for urban-renewal plots in Istanbul. As soon as a project is approved, the load-bearing system goes into workshop fabrication while excavation and foundations proceed on site. Once the foundation is complete, the prefabricated frame is assembled directly — no curing time for wet construction.

A steel frame is markedly lighter than an equivalent reinforced-concrete structure. Because seismic force scales with mass, a lighter building is subject to lower lateral loads, easing demands on both foundation and frame. Designs comply with the Turkish Building Earthquake Code (TBDY 2018) and the Steel Structures Regulation.

  • Short, low-disruption site periods on narrow plots
  • Workshop fabrication to millimetre tolerances
  • A recyclable frame that stays adaptable to future floor and partition changes